Search scope:
排序: Display mode:
Design and construction of Sutong Bridge twoer
Luo Chengbin,Zhou Jianlin,Tian Wei,Daijie
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 51-56
Sutong Bridge tower with 300.4 m is the highest one in the world, TheThe wind-resistance safety of tower in construction stage against the wind is important especially.In this paper, the design of composite structure is introduced.The key technologies of tower geometry control and wind resistance in construction stage are analyzed
Keywords: Sutong Bridge tower's design and construction
The design and construction of cat walk system for Taizhou Bridge
Zhou Chang,Du Hongchi
Strategic Study of CAE 2010, Volume 12, Issue 4, Pages 63-67
Taizhou Bridge is the first kilometer level three-pylon two-span suspensionbridge.The design and construction of cat walk system is critical to the installation of the superstructuresThe design of cat walk system of Taizhou Bridge chosen the continuous four-span structure without anti-windThis paper describes details and construction sequences of the overall design of the cat walk system
Keywords: suspension bridge cat walk system construction
Particle swarm optimization model to predict scour depth around a bridge pier
Shahaboddin SHAMSHIRBAND, Amir MOSAVI, Timon RABCZUK
Frontiers of Structural and Civil Engineering 2020, Volume 14, Issue 4, Pages 855-866 doi: 10.1007/s11709-020-0619-2
Keywords: scour depth bridge design and construction particle swarm optimization computational mechanics artificialintelligence bridge pier
Zheng Jielian,Wang Jianjun,Mou Tingmin,Feng Zhi,Han Yu,Qin Dayan
Strategic Study of CAE 2014, Volume 16, Issue 8, Pages 33-37
Based on the design and complete construction techniques of 500m-spanconcrete filled steel tubular (CFST) arch bridge, a feasibility study on design and construction techniquesof 700m-span CFST arch bridge was conducted.The general design and construction schemes were figured out, and key techniques were detailed studiedConsidering economical efficiency, safety and other factors, CFST arch bridge is a strong competitor
Keywords: bridge engineering span of 700m grade concrete filled steel tubular(CFST) arch bridge design construction
He Ping,Guan Yijun,Zhang Xiongwen,Zhang Qun,Zhou Jianhua
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 44-50
Keywords: Sutong Bridge deep-water group piles scour protection design and construction
Elmira SHOUSHTARI, M. Saiid SAIIDI, Ahmad ITANI, Mohamed A. MOUSTAFA
Frontiers of Structural and Civil Engineering 2020, Volume 14, Issue 1, Pages 169-184 doi: 10.1007/s11709-019-0590-y
Keywords: shake table test accelerated bridge construction steel girder bridge OpenSEES UHPC simple for dead continuous
General framework for bridge life cycle design
Junhai MA, Airong CHEN, Jun HE
Frontiers of Structural and Civil Engineering 2009, Volume 3, Issue 1, Pages 50-56 doi: 10.1007/s11709-009-0004-7
Keywords: bridge whole life design design phase design process general framework
Structural design and construction of catway for the Fourth Nanjing Yangtze River Bridge
Luan Changhua, Shen Bin
Strategic Study of CAE 2013, Volume 15, Issue 8, Pages 48-53
The Fourth Nanjing Yangtze River Bridge is a two-tower, three-span suspensionbridge with the main span of 1 418 m, where in the catway with no wind cable and no vibration suppressionmechanism for construction of the superstructure is a three-span continuous catway system.Structural design, erection, adjustment and demolition of the catway are systematically described indetail in this paper, which could provide great reference for catway structural design and construction
Keywords: the Fourth Nanjing Yangtze River Bridge catway structural design catway erection catway adjustment
Seismic performance of precast hollow bridge piers with different construction details
Zhiqiang WANG,Jiping GE,Hongyi WEI
Frontiers of Structural and Civil Engineering 2014, Volume 8, Issue 4, Pages 399-413 doi: 10.1007/s11709-014-0273-7
Keywords: hollow pier seismic performance cyclic load precast concrete bridge columns
Lu Zhongmin
Strategic Study of CAE 2010, Volume 12, Issue 11, Pages 20-24
Keywords: offshore wind farm site selection voltage elevation method design and construction of foundation erection
Precast steel–UHPC lightweight composite bridge for accelerated bridge construction
Shuwen DENG, Xudong SHAO, Xudong ZHAO, Yang WANG, Yan WANG
Frontiers of Structural and Civil Engineering 2021, Volume 15, Issue 2, Pages 364-377 doi: 10.1007/s11709-021-0702-3
Keywords: accelerated bridge construction ultrahigh-performance concrete steel–UHPC composite bridge UHPC girder-to-girder
Design and construction of Sutong Bridge deep-water main pylon foundations
Ren Huixing,Ouyang Xiaoyong,He Maosheng,Yang Hong,Sun Keqiang
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 38-43
This paper, from three aspects including construction conditions, foundationdesign and construction, introduces some considerations in the designing of main-pylon foundations andsome practical measures to deal with certain unfavorable construction conditions, such as deep water, tidal effect, soft stratum and heavy traffic, during the construction of main-pylon foundations.
Keywords: Sutong Bridge group-pile foundation steel cofferdam scour protection
The Research Review of the Impact of Design to Construction Safety
Lin Yang,Qi-ming Li
Frontiers of Engineering Management 2015, Volume 2, Issue 3, Pages 224-227 doi: 10.15302/J-FEM-2015044
Keywords: constructability construction safety prevention thought design
Materials-oriented integrated design and construction of structures in civil engineering—A review
Frontiers of Structural and Civil Engineering 2022, Volume 16, Issue 1, Pages 24-44 doi: 10.1007/s11709-021-0794-9
Keywords: integrated design and construction fiber-reinforced concrete fiber-reinforced polymer light-weight
Experimental monitoring of the strengthening construction of a segmental box girder bridge and field
Ali Fadhil NASER, Zonglin WANG
Frontiers of Structural and Civil Engineering 2012, Volume 6, Issue 3, Pages 308-320 doi: 10.1007/s11709-012-0140-3
Keywords: prestressed concrete box girder monitoring external tendons strain deflection
Title Author Date Type Operation
Design and construction of Sutong Bridge twoer
Luo Chengbin,Zhou Jianlin,Tian Wei,Daijie
Journal Article
The design and construction of cat walk system for Taizhou Bridge
Zhou Chang,Du Hongchi
Journal Article
Particle swarm optimization model to predict scour depth around a bridge pier
Shahaboddin SHAMSHIRBAND, Amir MOSAVI, Timon RABCZUK
Journal Article
Feasibility Study on Design and Construction of Concrete Filled Steel Tubular Arch Bridge with a Span
Zheng Jielian,Wang Jianjun,Mou Tingmin,Feng Zhi,Han Yu,Qin Dayan
Journal Article
Design and construction of scour protection for deep-water group pile foundation structures of two pylonsin Sutong Bridge
He Ping,Guan Yijun,Zhang Xiongwen,Zhang Qun,Zhou Jianhua
Journal Article
Pretest analysis of shake table response of a two-span steel girder bridge incorporating acceleratedbridge construction connections
Elmira SHOUSHTARI, M. Saiid SAIIDI, Ahmad ITANI, Mohamed A. MOUSTAFA
Journal Article
Structural design and construction of catway for the Fourth Nanjing Yangtze River Bridge
Luan Changhua, Shen Bin
Journal Article
Seismic performance of precast hollow bridge piers with different construction details
Zhiqiang WANG,Jiping GE,Hongyi WEI
Journal Article
Study on key technologies employed in planning and construction of Shanghai Donghai Bridge offshore wind
Lu Zhongmin
Journal Article
Precast steel–UHPC lightweight composite bridge for accelerated bridge construction
Shuwen DENG, Xudong SHAO, Xudong ZHAO, Yang WANG, Yan WANG
Journal Article
Design and construction of Sutong Bridge deep-water main pylon foundations
Ren Huixing,Ouyang Xiaoyong,He Maosheng,Yang Hong,Sun Keqiang
Journal Article
The Research Review of the Impact of Design to Construction Safety
Lin Yang,Qi-ming Li
Journal Article
Materials-oriented integrated design and construction of structures in civil engineering—A review
Journal Article